San Marcos High School Gym Arch Repair
Repair to gym arches with the use of epoxy injections, steel plates and welding along with modification of landscape and hardscape surrounding repaired arches.
Repair to gym arches with the use of epoxy injections, steel plates and welding along with modification of landscape and hardscape surrounding repaired arches.
This project consisted of re-roofing the high school campus with tile roof systems and built up roof systems. The project also included electrical upgrades to the classrooms.
This project consisted of construction of a new accessible concrete ramp for disabled access, retaining walls, site drainage, landscaping and fencing.
This project consisted of the removal and replacement of existing fencing, footings, and curbs with new fencing. The project also included new pedestrian gates at existing sidewalks and a new vehicular gate.
This project consisted of modernization and ADA upgrades to classroom and restrooms, along with new accessible ramp, courtyard improvements
This project involved demo and replacement of the swimming pool concrete deck and surrounding area as well as accessibility renovations.
This project consisted of the modernization of two science classrooms including construction of a mechanical equipment platform, metal framing, interior finishes and new laboratory casework.
This project included the removal of existing wooden bleachers and replacement with aluminum bleacher seating and decking. Additional work for this project included drainage system, concrete, structural steel and railings.
This project consisted of asbestos and lead mitigation, modernization and ADA upgrades to locker room, first aid room and restroom on a high school campus.
This project consisted of site and utilities work for the replacement of six relocatable classrooms with new relocatable classrooms, installation of three relocatable buildings, and the addition of one relocatable restroom.