Blog

  • McKinley Elementary School Boiler Replacement and HVAC Revisions

    This project consisted of the replacement of the steam boiler system for a hot water boiler system, restoration of radiators, plumbing and electrical work. Additional work included providing new fan coil unit and HVAC system.

    Read More
  • San Marcos High School & Dos Pueblos High School Baseball Backstop Replacement Project

    This project consisted of new baseball backstops and site improvements at two high schools. SMHS additional work included paving, two new accessible parking spaces, accessible sidewalk work, and CMU retaining walls. DPHS additional work included accessible walkway improvements, new shade structures and restroom improvements.

    Read More
  • SBUSD Administrative Center HVAC Replacement Project

    This project consisted of alterations to existing district office building for the purpose of HVAC unit replacements in existing mechanical room. Additional work included interior finishes, plumbing, and electrical.

    Read More
  • Dos Pueblos High School Storefront Windows Replacement Project

    This project consisted of the demolition of selected existing window systems and replaced with new aluminum storefront window systems. Additional work included accessibility restroom and toilet partitions upgrades.

    Read More
  • San Benito Elementary School Reconstruction

    This project consisted of the modernization of an entire campus, (7) buildings in total. The modernization includes ADA improvements and a complete gut of the buildings along with a put back of new lights, HVAC, plumbing, technology, windows, doors, roofing, casework and interior finishes. Exterior improvements consist of painting,...

    Read More
  • Atascadero High School Black Box Theatre and Music Department MOD

    This project consisted of modernization of existing Building 1400, Music Building, Band and Choral Departments, renovation of existing restrooms and conversion of existing Shop/Classroom Building 1500 to be black box theatre, supporting spaces and classroom.

    Read More
  • New Construction

    New construction of 1800 square foot, 3 bedroom, office and two bath residence.  Work involved concrete, framing, interior specialties including drywall, paint, carpet and tile floors.  Project also included retaining walls, landscape, hardscape and a tile roof. New Construction of 3000 square foot, 4 bedroom, office and three bath...

    Read More
  • Remodels

    Remodel of 1700 square foot residence.  Work involved reconfiguration of interior rooms, electrical panel upgrade, updated windows, drywall, paint, carpet, tile floors, modernized bathrooms with jacuzzi tub, new tile roof, landscape and hardscape. Remodel of 2000 square foot residence.  Reconfiguration of interior rooms, electrical panel upgrade, overhead electrical lines...

    Read More
  • Atascadero High School Quad Improvements

    Project performing a complete renovation of the Atascadero High School exterior quad area.  Construction included platform concrete benches, hardscape, decorative interlocking pavers symbolizing the layers of the earth, landscaping and handrail installation.

    Read More
  • SLO County Office of Education Parking Lot

    Development of a approximately 24,000 square feet creating a new 45 space parking lot.  The project involved site work, concrete, paving, striping, landscaping and signage. 

    Read More