Blog

  • Atascadero Unified School District Maintenance, Operations and Transportation Paving & Bus Wash

    Project paving approximately 110,000 square foot parking lot and associated striping.  Scope also included a bus wash platform with steel faced curbs and hose reels.

    Read More
  • Atascadero Unified School District MOT Shops

    Constructed a new maintenance shop (4,900 square feet), maintenance store room building (4,800 square feet) and a commercial drive in freezer building (576 square feet).  Each building is constructed of a CMU base wall with a metal frame structure on top.  The project involved site work, paving, striping, drainage,...

    Read More
  • San Marcos High School Gym Roof Replacement

    Replaced the gymnasium roof with standing seam metal roof panels.  Project involved the removal of existing asphalt shingle roof and membrane on barrel roof, installed new rigid insulation and standing seam metal roof panels, signage and bird deterrent system.  This unique project installed a single panel system with custom...

    Read More
  • Templeton Middle/Elementary School Modernization

    Modernized several classrooms, gymnasium and restrooms on an elementary and middle school campus.  Scope of work included reconfiguration of classrooms and office spaces, site development, concrete work, fencing, new wood floor and striping, floor cover, epoxy floor systems, ceramic tile, electrical, fire alarm,  mechanical, plumbing, metal roof, paint, tackable,...

    Read More
  • San Marcos High School Health Careers Academy

    Constructed a new 7,046 square foot single-story masonry classroom building to accommodate a new Health Academy. Work involved site development, electrical infrastructure, campus water line upgrade from 6” line to 8” line, utility improvements including mechanical, electrical, plumbing, data, fire alarm and telecom, access improvements, excavation, grading, landscaping, irrigation,...

    Read More
  • Paso Robles High School Building 600 Modernization

    Alterations to existing welding shop and agricultural/floral facility providing new classrooms to accommodate an information technology center.  Project also included modifications to their construction technology facility incorporating an upgraded compressor, outdoor shade structure and new state of the art dust collection system.  This fast track project was carefully coordinated...

    Read More
  • Gilroy Ascencion Solorsano Middle School Relocatable Buildings, Site Work and Utilities Project

    Site development at several locations on campus for the installation of 3 reloctable buildings.  Project included site work, AC paving, underground utilities, electrical and fire alarm, ADA parking improvements, site concrete, fencing, handrail, toilet accessories, and signage.

    Read More
  • SLO County Office of Education First 5 Early Education Center

    Developed a 2 acre site and installed 4 relocatable buildings for the San Luis Obispo County Office of Education.  The project consisted of site utilities, concrete flatwork, off site street improvements, fencing, landscape, electrical, fire alarm, plumbing, floor cover and signage.

    Read More
  • San Luis Obispo County Office of Education Play Area

    Constructed a state of the art play area for San Luis Obispo County Office of Education.  Play structure systems included poured in place rubberized fall surface, slides, water bubbler fountain, stamped and stained concrete tricycle track, water features, stepping logs, rope climb and a rock climb.  Work also included...

    Read More
  • Atascadero Unified School District Maintenance, Operations & Transportation Facility

    Constructed a Maintenance, Operation and Transportation Facility on approximately 5 acres.  Construction consisted of a 4,402 square foot wood framed Administration Building and a 6,760 square foot masonry block Transportation/Maintenance shop. The site development included hardscape, landscape, drainage & utilities.  The new facility has a state of the art...

    Read More