Blog

  • Santa Barbara High School Modernization

    Renovations and ADA improvements of restrooms, classrooms, student store, stadium, theatre, accessible ramps and walk ways throughout the Santa Barbara High School campus.  

    Read More
  • Cal Poly San Luis Obispo Housing Administration

    Construction of  a new two story Housing Administration Building at Cal Poly San Luis Obispo, approximate 8,400 square feet.  The building was constructed of steel and prefabricated wood structural framing.  Complete with an elevator system and interior finishes.

    Read More
  • Atascadero High School Buildings 600, 900, 1100 & 1200 MOD

    This project included the modernization of four buildings including interior finishes, doors, glazing, plumbing, HVAC and electrical.  Exterior improvements included new roofing, metal soffits, painting, removal of lockers, covered walk repair, shading devices, skylights, concrete and ADA improvements.

    Read More
  • San Marcos High School HVAC Modernization

    This project included HVAC Replacement at high school campus,  new soffits and louvers at selected buildings, removal of heat ventilators at all buildings, installation of relief air, floor and wall patches to match adjacent finishes, and replacement of folding partitions and other framed walls with permanent stud wall, construction...

    Read More
  • Goleta Valley Jr. High School Roofing

    This project included full roof replacement to selected existing buildings and covered walkways, patching and repairs necessary from reroofing work and mechanical, plumbing and electrical work associated with the reroofing work.  All work was completed on an active school campus. 

    Read More
  • Templeton Middle School Glulam Beam Repairs

    Project involved the repair of decay and dry rot in curved glue-laminated beam arches of a single story gymnasium. Repairs involved wood stabilizers, wood restore products, painting and sheet metal covers.

    Read More
  • Cayucos Sanitary District Operations & Maintenance Facility

    New construction of a single-story masonry building to accommodate a new garage and shop for the Cayucos Sanitary District. Construction consisted of site development, epoxy floor coatings, decorative iron railings, casework, accessories, windows and skylights, paver block parking lot, landscape, ceramic tile, fire sprinkler and fire alarm system, HVAC, electrical, roll-up...

    Read More
  • Shell Beach Fire Station Remodel

    Remodel of existing Shell Beach Fire Station #63 and addition of storage, living and dining areas.  Alterations included a remodeled kitchen, addition of fire sprinklers, reconfiguration of living and storage areas, ADA improvements,  hardscape, fencing and landscape.

    Read More
  • Pismo Beach Veterans Memorial Building Structural Rehabilitation

    The project included the re-support of the building floor, repair of interior and exterior finishes, upgrade of site drainage system and installation of seismic improvements.  As the project site was restricted, careful coordination, planning and care went into completing and preserving this community building.

    Read More
  • San Marcos High School Electrical Infrastructure

    This project included the removal of the existing 4180v electrical infrastructure and replacement with 480v system, including new 2500A electrical service. It replaced all main electrical panels in each building throughout campus, and various low voltage conduits in common trench. In addition, the project provided for future photovoltaic array work that is...

    Read More