San Marcos High School ADA Restroom Upgrades Phase II
This project consisted of asbestos and lead mitigation, modernization and ADA upgrades to locker room, first aid room and restroom on a high school campus.
This project consisted of asbestos and lead mitigation, modernization and ADA upgrades to locker room, first aid room and restroom on a high school campus.
This project consisted of site and utilities work for the replacement of six relocatable classrooms with new relocatable classrooms, installation of three relocatable buildings, and the addition of one relocatable restroom.
This project consisted of the replacement of the steam boiler system for a hot water boiler system, restoration of radiators, plumbing and electrical work. Additional work included providing new fan coil unit and HVAC system.
This project consisted of new baseball backstops and site improvements at two high schools. SMHS additional work included paving, two new accessible parking spaces, accessible sidewalk work, and CMU retaining walls. DPHS additional work included accessible walkway improvements, new shade structures and restroom improvements.
This project consisted of alterations to existing district office building for the purpose of HVAC unit replacements in existing mechanical room. Additional work included interior finishes, plumbing, and electrical.
This project consisted of the demolition of selected existing window systems and replaced with new aluminum storefront window systems. Additional work included accessibility restroom and toilet partitions upgrades.
This project consisted of the modernization of an entire campus, (7) buildings in total. The modernization includes ADA improvements and a complete gut of the buildings along with a put back of new lights, HVAC, plumbing, technology, windows, doors, roofing, casework and interior finishes. Exterior improvements consist of painting,...
This project consisted of modernization of existing Building 1400, Music Building, Band and Choral Departments, renovation of existing restrooms and conversion of existing Shop/Classroom Building 1500 to be black box theatre, supporting spaces and classroom.
Constructed a new maintenance shop (4,900 square feet), maintenance store room building (4,800 square feet) and a commercial drive in freezer building (576 square feet). Each building is constructed of a CMU base wall with a metal frame structure on top. The project involved site work, paving, striping, drainage,...
Replaced the gymnasium roof with standing seam metal roof panels. Project involved the removal of existing asphalt shingle roof and membrane on barrel roof, installed new rigid insulation and standing seam metal roof panels, signage and bird deterrent system. This unique project installed a single panel system with custom...