Atascadero Unified School District MOT Shops

Constructed a new maintenance shop (4,900 square feet), maintenance store room building (4,800 square feet) and a commercial drive in freezer building (576 square feet).  Each building is constructed of a CMU base wall with a metal frame structure on top.  The project involved site work, paving, striping, drainage, underground utilities (water, gas, electrical and sewer), HVAC systems, concrete walkways, site CMU wall, fencing, ceramic tile, interior finishes, casework, doors, windows, overhead coiling doors and a fire sprinkler system.